Day 4, G3 minor storm
A coronal mass ejection observed in profile on 6 April at 19:20 UTC, modelled speed 940 km/s, expected arrival 10 April between 02:00 and 06:00 UTC.
Operations
A public mirror of the operations room in Davos. Values shown here are simulated for demonstration; the operational feed is served to member states through the secure channel.
Index now
Current geomagnetic condition — Active
Downlink
Refreshed every 2.6 seconds from the spacecraft simulator. Mission clock 00:00:00 UTC.
X-ray flux, last 2 hours
Mission log
Bulletin 244
Issued at 06:00 UTC. A watch is raised when the modelled index reaches G3 on any day of the window.
A coronal mass ejection observed in profile on 6 April at 19:20 UTC, modelled speed 940 km/s, expected arrival 10 April between 02:00 and 06:00 UTC.
Transformer monitoring recommended in northern networks. Polar routes above 78° should plan for high-frequency communication loss.
Arrival-time spread of four hours, based on the stereoscopic reconstruction between L5 and near-Earth assets.
Choose which categories you allow. Your choice is stored locally for twelve months and can be changed at any time from the footer.
Session integrity, security and your cookie choice itself. These cannot be switched off.
Anonymous, aggregated statistics on which pages are read. No profiling, no advertising, no transfer outside Switzerland.
Allows video and interactive orbit viewers hosted by third parties to load on gallery and forecast pages.